INSTALLATION INSTRUCTIONS
HEALTH AND SAFETY PRECAUTIONS
Please take care when installing the stove that the requirements of
the Health and Safety at Work Act 1974 are met.
The ducted air supply provides combustion air to the stove, through
an 80mm diameter duct. One end of the air supply ducting is
connected to the stove and the other can be terminated in the room
if the house design air permeability is greater than 5.0m³/(h.m²), or
can be ducted directly to outside. The ducting must be less than
5.5m long and must not have more than five 90° bends and two 45°
elbows. In both cases the inlet must be permanently open and the
duct free of any constrictions. The inlet must have a suitable open
grille fitted to prevent entry by vermin.
Some types of fire cement are caustic and should not be allowed to
come into contact with the skin. In case of contact, wash with plenty
of water.
If there is a possibility of disturbing any asbestos in the course of
installation then please use appropriate protective equipment.
There must not be an extractor fan fitted in the same room as the
stove as this can cause the appliance to emit fumes into the room.
The combustion air supply ducting must be connected to a suitable,
permanently open air inlet. See ‘Air supply’ section for details. This
stove is capable of intermittent operation. This stove is not suitable
for use in a shared flue system.
In addition to these instructions the requirements of BS 8303 and
BSEN 15287-1:2007 must be fulfilled. Local Authority Bylaws and
Building Regulations, including those referring to national and
European Standards, regarding the installation of Solid Fuel burning
appliances, flues and chimneys must also be observed.
AIR SUPPLY
A spillage test must be
carried out during commissioning to verify adequate supply to the
stove.
UNPACKING THE STOVE
The stove arrives bolted to its pallet and covered with a cardboard
box. The bands are first removed and then the box is lifted, then the
stove is released from the pallet by removing the 2 brackets using a
13mm spanner. The bracket on the rear is removed with a 10mm
Spanner.
The pallet is intended to be cut up and used for kindling fuel
CO ALARMS
Building regulations require that whenever a new or replacement
fixed solid fuel or wood/biomass appliance is installed in a dwelling a
carbon monoxide alarm must be fitted in the same room as the
appliance. Further guidance on the installation of the carbon
monoxide alarm is available in BS EN 50292:2002 and from the
alarm manufacturer's instructions. Provision of an alarm must not be
considered a substitute for either installing the appliance correctly or
ensuring regular servicing and maintenance of the appliance and
chimney system.
Multifuel results obtained using ‘Homefire’ fuel burned over a 1hr period.
Wood Figures were achieved burning seasoned hardwood logs over a 45
minute refuelling period.
SPECIFICATION
Wood Multi Fuel
Output
Stove Weight
Flue Gas Temperature
Flue Gas Mass Flow
Average refuelling cycle
Min Flue Draught 12Pa
CO at 13% 02 0.08% 0.18%
Maximum Log Size
5kw 4.9kw
105kg 105kg
279°C 282°C
4.4g/s 4.3 g/s
0.75hrs 1.0 hr
12Pa
300mm long
x 75mm diameter
Page view 10